Swift Logistics



This 50kW project for a large warehouse facility required robust engineering due to the structure's metal roofing and exposure to high winds. We reinforced the mounts and used anti-reflective coated panels to maximize yield. The project helped the logistics firm cut down on peak-hour surcharges and improved their carbon footprint by over 30 tons annually. Energy consumption reports are auto-generated and shared with the corporate HQ.